Specialty Chemicals R&D Laboratory

BYK USA

New two-story research and development laboratory and regional headquarters building for a clays processing plant.

Location: Gonzalez, TX

Size: 25,000 GSF

Delivery Method: Traditional

Construction Type: New Construction

Specialty Chemicals R&D Laboratory - BYK USA
Specialty Chemicals R&D Laboratory - BYK USA
Specialty Chemicals R&D Laboratory - BYK USA
Specialty Chemicals R&D Laboratory - BYK USA

Challenge

BYK had outgrown its existing laboratory and office space. The outdated facility could not handle the volume of research being conducted and was not flexible enough to accommodate changes in research. The client wanted a larger, more modern facility to serve as a new front door to the large clays processing plant.

Solution

Our thoughtful approach to the laboratory’s layout resulted in an open-concept laboratory so processes with heavy gas, power, or exhaust demands can relocate or grow with little or no disruption to adjacent operations. Our detailed study of materials flow identified the ideal access point for bulky materials. Plant-side laboratory access to materials, samples, and maintenance minimizes travel through staff and visitors areas. Since the labs are adjacent to sensitive office spaces, structural and mechanical designs isolate moving equipment.

The two-story, tilt wall and glass curtainwall facility features a double-height lobby to maximize its presence as the new front door to the plant. The 12,000 SF analytical, QA, and R&D laboratory features a combination of interior and exterior glazing, with views to the collaborative workspaces of investigators, technicians, and laboratory managers.

Specialty Chemicals R&D Laboratory - BYK USA